Balboa 240V Power Hook Up
Balboa 240V Power Hook Up.
Electrical Hook Up Must Be Performed By A Licensed Electrician
For 240V power hook up dip switch 10 must be in the off position.
For 240V make sure there is not jumper wire installed from J11 to J32. (WHT AC to RED AC)
If jumper wire is not removed GFCI will trip instantly.

For 240V power hook up dip switch 10 must be in the off position.
For 240V make sure there is not jumper wire installed from J11 to J32. (WHT AC to RED AC)
If jumper wire is not removed GFCI will trip instantly.





Reference Card for the Single Pump Geko Control Panel